<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0">
    <channel>
        <title>ucononline.com RSS </title>
        <link>https://ucononline.com</link>
        <description>Underground Construction</description>

            <item>
                <title><![CDATA[ Wyo-Ben’s Max Gel, Max Bore HDD system boost drilling efficiency, performance ]]></title>
                <link>http://admin.undergroundinfrastructure.com/magazine/2024/september-2024-vol-79-no-9/features/wyo-ben-s-max-gel-max-bore-hdd-system-boost-drilling-efficiency-performance</link>
                <description>
                    <![CDATA[
                    Wyo-Ben’s Max Gel and Max Bore HDD system offer premium solutions for enhanced drilling performance and efficiency. These innovative products ensure superior wellbore stability, suspension, and filtration control, making them essential tools for a variety of drilling applications.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ EarthGrid, EnerTech to deploy underground infrastructure projects across US in $18 billion investment ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2024/september/earthgrid-enertech-to-deploy-underground-infrastructure-projects-across-us-in-18-billion-investment</link>
                <description>
                    <![CDATA[
                    Utilizing EarthGrid&#39;s patented plasma-powered machines, this joint venture will develop a network of underground tunnels designed to upgrade the current power grid and fiber networks with reliability, efficiency, and resiliency while accelerating the clean power transition.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ GDC awards first tunnel boring contract for NY-NJ project for $465 million ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2024/august/gdc-awards-first-tunnel-boring-contract-for-ny-nj-project-for-465-million</link>
                <description>
                    <![CDATA[
                    The Palisades Tunnel Project will construct the first mile of 5,100-foot twin tunnels on the New Jersey side, including boring, lining with waterproof concrete, and creating the Hudson County Shaft for Tunnel Boring Machine removal.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ GDC secures $16 billion for Hudson Tunnel project, set to create 95,000 jobs ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2024/july/gdc-secures-16-billion-for-hudson-tunnel-project-set-to-create-95-000-jobs</link>
                <description>
                    <![CDATA[
                    The Gateway Development Commission has finalized the funding needed for the Hudson Tunnel Project, securing a total of $16 billion. The HTP, a major underground infrastructure project, will replace and expand the aging rail tunnel beneath the Hudson River.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Construction begins on new water pipeline project in Kyle, Texas ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2024/july/construction-begins-on-new-water-pipeline-project-in-kyle-texas</link>
                <description>
                    <![CDATA[
                    At over 20 miles in length, Segment C marks the final segment of the Alliance Water transmission system to begin construction and is anticipated to be completed in Fall 2025.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Second tunnel-boring machine breaks through at future Oak-VGH Station in Canada ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2023/october/second-tunnel-boring-machine-breaks-through-at-future-oak-vgh-station-in-canada</link>
                <description>
                    <![CDATA[
                    (UI) — The second tunnel-boring machine has broken through at the future Oak-VGH Station, signaling a new milestone for the Broadway Subway Project.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ GPR: From glaciers to conduits, digs deeper so you don’t have to ]]></title>
                <link>http://admin.undergroundinfrastructure.com/magazine/2023/june-2023-vol-78-no-6/features/gpr-from-glaciers-to-conduits-digs-deeper-so-you-don-t-have-to</link>
                <description>
                    <![CDATA[
                    (UI) — The ability to accurately map underground or encased infrastructure allows construction and excavation professionals to plan groundbreaking and other destructive activities more efficiently. By knowing where not to dig, cut or core, these professionals eliminate the risks associated with striking buried utilities or severing structural components, such as rebar or post-tension cables.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Springfield&#39;s aging sewer system in Doling Park-Pea Ridge Creek set for major replacement work ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2023/may/springfields-aging-sewer-system-in-doling-park-pea-ridge-creek-set-for-major-replacement-work</link>
                <description>
                    <![CDATA[
                    (UI) — In order to accommodate anticipated expansion and development in the region, the major objectives of the work are to decrease the frequency of sewer overflows that result in pollution and enhance the size and capacity of underground sewer pipes to the 1,200 miles of pipe and over 28,000 manholes across the city.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Rural water district finds success with fusion, HDPE technologies ]]></title>
                <link>http://admin.undergroundinfrastructure.com/magazine/2023/april-2023-vol-78-no-4/features/rural-water-district-finds-success-with-fusion-hdpe-technologies</link>
                <description>
                    <![CDATA[
                    (UI) — For decades, Randall Community Water District worked with PVC pipe, joining the pipe with bell gaskets. But when the water district was faced with a 3,000-foot bore that couldn’t be done with PVC, Manager Scott Pick realized he needed to find another solution.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Eliminating the Need for Pulling Augers ]]></title>
                <link>http://admin.undergroundinfrastructure.com/magazine/2020/july-2020-vol-75-no-7/features/eliminating-the-need-for-pulling-augers</link>
                <description>
                    <![CDATA[
                    S.J. Louis Companies recently deployed an auger-boring steerable rock system to complete an on-grade sewer install in record time.
                    ]]>
                </description>
            </item>
    </channel>
</rss>
