<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0">
    <channel>
        <title>ucononline.com RSS </title>
        <link>https://ucononline.com</link>
        <description>Underground Construction</description>

            <item>
                <title><![CDATA[ W.A. Rasic advances San Diego $40 million pipeline with 66-inch main, I-8 tunnel ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/april/wa-rasic-advances-san-diego-40-million-pipeline-with-66-inch-main-i-8-tunnel</link>
                <description>
                    <![CDATA[
                    A $40 million San Diego pipeline project is installing a 66-inch water main and tunneling beneath Interstate 8 to improve system reliability and expand infrastructure capacity.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Texas city plans reclaimed water pipeline to boost supply amid drought ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/march/texas-city-plans-reclaimed-water-pipeline-to-boost-supply-amid-drought</link>
                <description>
                    <![CDATA[
                    Kerrville, Texas, is advancing plans for a 1.6-mile reclaimed water pipeline to support indirect potable reuse, aiming to improve long-term water supply reliability as drought conditions persist.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ 48-in. pipeline, HDD crossing to expand Texas gas flows into Louisiana LNG corridor ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/march/48-in-pipeline-hdd-crossing-to-expand-texas-gas-flows-into-louisiana-lng-corridor</link>
                <description>
                    <![CDATA[
                    A new 48-in. pipeline segment and HDD crossing are proposed to connect Texas gas supplies with existing Louisiana pipeline systems.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Senate approves 40-mile Southern Nevada water pipeline beneath Sloan Canyon ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/february/senate-approves-40-mile-southern-nevada-water-pipeline-beneath-sloan-canyon</link>
                <description>
                    <![CDATA[
                    The U.S. Senate has approved legislation authorizing a 40-mile Southern Nevada water pipeline beneath Sloan Canyon, a project aimed at improving water reliability for Henderson and the Las Vegas Valley.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Portland advances Bull Run raw water tunnel and pipeline construction ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/february/portland-advances-bull-run-raw-water-tunnel-and-pipeline-construction</link>
                <description>
                    <![CDATA[
                    Portland’s Bull Run Filtration Project is advancing with tunnel excavation and more than 6,000 feet of new underground pipeline installed as the city works toward a 2027 regulatory compliance deadline.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Stantec-Rados to design 11-mile recycled water pipeline in Southern California ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/february/stantec-rados-to-design-11-mile-recycled-water-pipeline-in-southern-california</link>
                <description>
                    <![CDATA[
                    Stantec and Rados will design an 11-mile recycled water pipeline and pump station in San Bernardino County to deliver recycled water to the Inland Empire Utilities Agency system.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Tampa Bay Water begins tunneling on $500 million, 26-mile Hillsborough pipeline ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/february/tampa-bay-water-begins-tunneling-on-500-million-26-mile-hillsborough-pipeline</link>
                <description>
                    <![CDATA[
                    Tampa Bay Water has begun tunneling work on a 26-mile underground pipeline designed to deliver 65 million gallons per day to southern Hillsborough County, with full completion expected by 2028.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ FERC clears Transco’s 55-mile pipeline across Virginia and the Carolinas ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/february/ferc-clears-transco-s-55-mile-pipeline-across-virginia-and-the-carolinas</link>
                <description>
                    <![CDATA[
                    FERC has approved Transco’s 55-mile Southeast Supply Enhancement pipeline expansion, authorizing new large-diameter pipeline and compressor upgrades to add 1.6 MMdth/d of gas capacity across five states.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Dual-threat approach conquers West Texas pipeline challenge ]]></title>
                <link>http://admin.undergroundinfrastructure.com/magazine/2026/january-2026-vol-81-no-1/features/dual-threat-approach-conquers-west-texas-pipeline-challenge</link>
                <description>
                    <![CDATA[
                    A West Texas pipeline project for Kinetik highlights how 2 Stone Industries combined trenching and HDD methods to complete a 44-mile NGL pipeline under a tight construction timeline.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings ]]></title>
                <link>http://admin.undergroundinfrastructure.com/magazine/2025/december-2025-vol-80-no-12/features/inside-sempra-s-72-mile-pipeline-with-18-major-trenchless-crossings</link>
                <description>
                    <![CDATA[
                    Sempra Infrastructure’s Port Arthur Pipeline Louisiana Connector Project includes 72 miles of 42-inch pipeline and 18 trenchless crossings totaling more than 57,000 feet, making it one of the most complex HDD projects in the region.
                    ]]>
                </description>
            </item>
    </channel>
</rss>
