<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0">
    <channel>
        <title>ucononline.com RSS </title>
        <link>https://ucononline.com</link>
        <description>Underground Construction</description>

            <item>
                <title><![CDATA[ Austin completes storm drain upgrade, greenbelt improvements along Williamson Creek ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/march/austin-completes-storm-drain-upgrade-greenbelt-improvements-along-williamson-creek</link>
                <description>
                    <![CDATA[
                    Austin officials have completed drainage upgrades and greenbelt improvements along Williamson Creek, including 1,600 feet of new storm drain designed to reduce flooding in southeast Austin.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ DC Water details environmental impacts, repairs after Potomac Interceptor collapse ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/february/dc-water-details-environmental-impacts-repairs-after-potomac-interceptor-collapse</link>
                <description>
                    <![CDATA[
                    DC Water is advancing repairs and environmental monitoring after a Potomac Interceptor collapse released an estimated 243 million gallons of wastewater into the Potomac River.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Jacobs selected for $200-million upgrades at San Jos&#233;–Santa Clara wastewater facility ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/january/jacobs-selected-for-200-million-upgrades-at-san-josé-santa-clara-wastewater-facility</link>
                <description>
                    <![CDATA[
                    Jacobs has been selected as the design-build contractor for a $200 million upgrade to the San Jos&#233;–Santa Clara Regional Wastewater Facility, modernizing biosolids treatment, replacing aging digesters and expanding biogas-to-energy capacity at one of the largest advanced wastewater plants in the western U.S.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Houston split over $30 million stormwater fund proposal for demolitions ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2025/december/houston-split-over-30-million-stormwater-fund-proposal-for-demolitions</link>
                <description>
                    <![CDATA[
                    Houston officials are debating whether stormwater mitigation funds can legally be used to demolish blighted buildings, drawing pushback over flood-control priorities.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Eagle Merchant Partners invests in Atlantic Pipe Services to expand water infrastructure rehabilitation ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2025/december/eagle-merchant-partners-invests-in-atlantic-pipe-services-to-expand-water-infrastructure-rehabilitation</link>
                <description>
                    <![CDATA[
                    Eagle Merchant Partners has made a strategic investment in Atlantic Pipe Services, one of Florida’s largest stormwater and wastewater inspection and rehabilitation providers. The partnership will support APS’ expansion, equipment investments and acquisitions as demand for water infrastructure maintenance grows statewide.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Savannah proposes tier-based stormwater fee to fund aging infrastructure upgrades ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2025/november/savannah-proposes-tier-based-stormwater-fee-to-fund-aging-infrastructure-upgrades</link>
                <description>
                    <![CDATA[
                    Savannah, Georgia, is proposing a tier-based stormwater fee system to fund drainage and flood-control upgrades. The plan ties costs to property runoff potential, supporting long-term maintenance and infrastructure improvements across the city’s aging stormwater network.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Galveston begins major drainage upgrade to curb mid-island flooding ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2025/november/galveston-begins-major-drainage-upgrade-to-curb-mid-island-flooding</link>
                <description>
                    <![CDATA[
                    Construction is underway on Galveston’s South Shore Drainage Project, which includes new stormwater infrastructure and a pump station at Offatts Bayou to reduce neighborhood flooding during high tides and major rainstorms.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Tucson, Ariz., issues floodplain notice for Esquer Park stormwater upgrade ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2025/june/tucson-ariz-issues-floodplain-notice-for-esquer-park-stormwater-upgrade</link>
                <description>
                    <![CDATA[
                    Tucson has issued a final floodplain notice for a planned stormwater basin reconstruction at Esquer Park, part of a federally funded effort to improve drainage in a FEMA flood zone and federally designated floodplain.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ University of Kentucky wins award for 25-million-gallon stormwater harvesting system ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2025/june/university-of-kentucky-wins-award-for-25-million-gallon-stormwater-harvesting-system</link>
                <description>
                    <![CDATA[
                    The University of Kentucky’s Utilities and Energy Management team earned a Grand Award for its stormwater harvesting system, which captures and reuses up to 25 million gallons annually to help power the Central Utility Plant.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Editor’s Log: Miles and miles to go ]]></title>
                <link>http://admin.undergroundinfrastructure.com/magazine/2025/april-2025-vol-80-no-4/editors-log/editor-s-log-miles-and-miles-to-go</link>
                <description>
                    <![CDATA[
                    In this month’s Editor’s Log, Editor-in-Chief Robert Carpenter examines the persistent challenges facing major cities like Chicago in managing stormwater and sewer infrastructure, highlighting why even billions in federal funding still leave critical gaps.
                    ]]>
                </description>
            </item>
    </channel>
</rss>
