<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0">
    <channel>
        <title>ucononline.com RSS </title>
        <link>https://ucononline.com</link>
        <description>Underground Construction</description>

            <item>
                <title><![CDATA[ Stormwater plan update highlights infrastructure gaps in Kalispell, Mont., system ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/march/stormwater-plan-update-highlights-infrastructure-gaps-in-kalispell-mont-system</link>
                <description>
                    <![CDATA[
                    An updated stormwater plan in Kalispell, Mont., found roughly one-third of the city’s pipes cannot handle a 10-year storm, prompting plans for upgrades to improve system capacity, reduce flooding and modernize aging infrastructure.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Sewer line break causes underground void, closes Cinco Ranch intersection ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/march/sewer-line-break-causes-underground-void-closes-cinco-ranch-intersection</link>
                <description>
                    <![CDATA[
                    A broken sewer line caused an underground void beneath a major intersection in Cinco Ranch, Texas, forcing road closures while crews investigate the collapse and begin repairs to the damaged wastewater infrastructure.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ $280 million invested in Illinois water, wastewater infrastructure upgrades in 2025 ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/february/280-million-invested-in-illinois-water-wastewater-infrastructure-upgrades-in-2025</link>
                <description>
                    <![CDATA[
                    Illinois American Water invested more than $280 million in 2025 to upgrade treatment plants, pipelines and wastewater systems statewide, expanding capital spending to modernize aging infrastructure and improve system reliability.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ American Water invests $3.2 billion in infrastructure as earnings rise, merger plans advance ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/february/american-water-invests-32-billion-in-infrastructure-as-earnings-rise-merger-plans-advance</link>
                <description>
                    <![CDATA[
                    American Water invested $3.2 billion in water and wastewater infrastructure in 2025 and plans continued system upgrades as it advances a merger with Essential Utilities and targets long-term growth across its regulated utility network.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ LSC to build 240-mile underground dark fiber network in Indianapolis ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/february/lsc-to-build-240-mile-underground-dark-fiber-network-in-indianapolis</link>
                <description>
                    <![CDATA[
                    Light Source Communications plans to build a 240-mile underground dark fiber network across Indianapolis, expanding data center connectivity with five new metro fiber rings scheduled for completion in 2027.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Army Corps awards Tetra Tech spot on $49-million water infrastructure design contract ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/february/army-corps-awards-tetra-tech-spot-on-49-million-water-infrastructure-design-contract</link>
                <description>
                    <![CDATA[
                    The U.S. Army Corps of Engineers has selected Tetra Tech for a $49-million multiple-award contract to support design and resiliency upgrades for dams, levees, navigation systems and other critical water infrastructure.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Permian produced-water infrastructure to support new lithium carbonate facilities in Texas ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/february/permian-produced-water-infrastructure-to-support-new-lithium-carbonate-facilities-in-texas</link>
                <description>
                    <![CDATA[
                    New lithium carbonate production facilities planned across the Permian basin will tap existing produced-water pipelines and treatment infrastructure, highlighting a growing push to repurpose oilfield water networks for critical-minerals recovery.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ NWPX Infrastructure names new executives to lead water transmission, precast operations ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/february/nwpx-infrastructure-names-new-executives-to-lead-water-transmission-precast-operations</link>
                <description>
                    <![CDATA[
                    NWPX Infrastructure has promoted four leaders into senior operations roles, strengthening oversight across its water transmission systems and precast infrastructure businesses as the company positions for continued growth.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ LA Metro advances fully underground rail option for Sepulveda Transit Corridor ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/february/la-metro-advances-fully-underground-rail-option-for-sepulveda-transit-corridor</link>
                <description>
                    <![CDATA[
                    The Los Angeles County Metropolitan Transportation Authority has approved a fully underground heavy-rail option for the Sepulveda Transit Corridor, advancing design and environmental review for one of Southern California’s largest tunneling and transit infrastructure projects.
                    ]]>
                </description>
            </item>
            <item>
                <title><![CDATA[ Altadena residents rebuilding after fire face new costs from undergrounding plan ]]></title>
                <link>http://admin.undergroundinfrastructure.com/news/2026/january/altadena-residents-rebuilding-after-fire-face-new-costs-from-undergrounding-plan</link>
                <description>
                    <![CDATA[
                    Altadena residents say SoCal Edison’s wildfire mitigation plan to bury power lines is leaving homeowners with unexpected bills of up to $40,000, sparking backlash as rebuilding continues after the Eaton Fire.
                    ]]>
                </description>
            </item>
    </channel>
</rss>
