2 Contracts Awarded for Lewis and Clark Pipeline Projects
TEA, S.D. (AP) – The organization responsible for a system that delivers Missouri River water to towns and rural water systems in South Dakota, Iowa and Minnesota has granted two contracts to expand its network.
The Lewis and Clark Regional Water System says a $2.9 million contract awarded to Winter Brothers Underground, of Sioux Falls, will result in the construction of two segments of the line serving the city of Madison. This project is part of a plan that will allow Madison to access up to one million gallons of water a day.
The system’s board of directors also awarded a $9.2 million contract to Carstensen Contracting, of Pipestone, Minnesota. The project involves the construction of a line from Magnolia, Minnesota, to the Lincoln Pipestone Rural Water System connection east of Adrian, Minnesota.
Related News
From Archive
- OSHA investigates fatal trench collapse at Conroe construction site
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Texas811 launches real-time excavation detection to prevent utility strikes
- Oil pipeline struck during fiber optic construction spills into L.A. storm drains
- Fiber drilling strike triggers major sewer failure, lawsuits in Florida
- Texas811 launches real-time excavation detection to prevent utility strikes
- Race Communications breaks ground on Bakersfield fiber network
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Inside Infrastructure: Utility locators warn of systemic failures in damage prevention process
- Senate passes PIPELINE Safety Act aimed at strengthening buried utility protection

Comments