New Mexico Water Officials Eye Pipeline to Colorado Lake
FARMINGTON, N.M. (AP) – A water commission is eyeing a possible pipeline from a Colorado lake to northern New Mexico.
The Daily Times reports (http://bit.ly/2cjL7FE) San Juan Water Commission members will meet in October to weigh having the pipeline designed at an estimated cost of $10,000 to $15,000.
Further study could cost up to $250,000.
Lake Nighthorse in southern Colorado is managed by the Bureau of Reclamation.
The man-made lake is fed by the Animas River.
Water has not been pumped from the reservoir in 2016 over concerns related to last year’s Gold King Mine wastewater spill.
Future lake recreation could lead to invasive species that may impact a pipeline
Commission director Aaron Chavez says Lake Nighthorse was originally intended for drought relief.
Related News
From Archive
- OSHA investigates fatal trench collapse at Conroe construction site
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Texas811 launches real-time excavation detection to prevent utility strikes
- Oil pipeline struck during fiber optic construction spills into L.A. storm drains
- Fiber drilling strike triggers major sewer failure, lawsuits in Florida
- Texas811 launches real-time excavation detection to prevent utility strikes
- Race Communications breaks ground on Bakersfield fiber network
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Inside Infrastructure: Utility locators warn of systemic failures in damage prevention process
- Senate passes PIPELINE Safety Act aimed at strengthening buried utility protection

Comments