Washington City to Place Water Pipeline in Service
4/25/2017
The City of Everett, Washington will place the $64 million Tulalip Water Pipeline Project into service on April 28.
The 7.5-mile-long pipeline, which will provide a 100-year water supply to Tulalip and Smith Island, runs from the city’s water transmission pipelines near the US Highway 2 bridge on the west side of the Snohomish River, north to 88th Street Northeast and 27th Avenue Northeast on the Tulalip Tribes Reservation.
To commemorate the occasion, the city is hosting a “Big Water” Celebration.
For more information, visit https://everettwa.gov/432/Tulalip-Water-Pipeline-Project.
Related News
From Archive
Sign up to Receive Our Newsletter
- Ohio trench collapse kills one worker, injures two during pipe installation
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Dominion proposes 186-mile underground HVDC power line across Virginia
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Massive water line failure leaves majority of Waterbury without service
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- Worm-like robot burrows underground to cut power line installation costs

Comments