Washington City to Place Water Pipeline in Service
4/25/2017
The City of Everett, Washington will place the $64 million Tulalip Water Pipeline Project into service on April 28.
The 7.5-mile-long pipeline, which will provide a 100-year water supply to Tulalip and Smith Island, runs from the city’s water transmission pipelines near the US Highway 2 bridge on the west side of the Snohomish River, north to 88th Street Northeast and 27th Avenue Northeast on the Tulalip Tribes Reservation.
To commemorate the occasion, the city is hosting a “Big Water” Celebration.
For more information, visit https://everettwa.gov/432/Tulalip-Water-Pipeline-Project.
Related News
From Archive
Sign up to Receive Our Newsletter
- OSHA cites Florida contractors for trench safety violations at sewer and excavation sites
- Biden-Harris administration invests $849 million in aging water infrastructure, drought resilience
- Cadiz to reuse steel from terminated Keystone XL pipeline for California groundwater project
- Texas contractor penalized by OSHA for repeated trench safety violations
- West Virginia approves $67 million for water, sewer projects
Comments