Michigan City to Remove Hundreds of Lead Water Pipes
KALAMAZOO, Mich. (AP) — More than 200 lead water pipes will be removed from a southwest Michigan city this summer.
MLive (http://bit.ly/2oU9UII ) reports the Kalamazoo City Commission approved a nearly $850,000 construction contract on Monday with Rieth-Riley Construction Co. to replace the lines. The city’s 2017 Water Capital Improvement Budget will fund the service line replacement project.
Public Services Director James Baker says Kalamazoo plans to replace almost 500 lead service lines during the 2017 construction season. Baker says on average the city has removed 100 lead pipes per year.
Many of the lead lines are located in the northeastern part of the city and in the city’s oldest neighborhoods.
The city collected lead and copper monitoring data a year early in response to public concern over the Flint water system lead problem.
Related News
From Archive
- Ohio trench collapse kills one worker, injures two during pipe installation
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Dominion proposes 186-mile underground HVDC power line across Virginia
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Massive water line failure leaves majority of Waterbury without service
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- Worm-like robot burrows underground to cut power line installation costs

Comments