Patent Awarded for “In-place” Coating to Protect Pipes Against Water Loss Due to Leaks

Pipe Restoration Technologies, LLC has been granted U.S. patent #9744561. This patent is related to the ePIPE system of in-place pipe restoration, which provides protection to underground pipes against leaks and harmful lead and copper leaching.
“ePIPE is providing superior solutions in response to real-time issues of providing protection against leaks and reducing the leaching of toxic metals like lead and copper from underground pressurized water supply pipes,” said Pipe Restoration Technologies CEO Larry Gillanders. “With some utilities reporting water loss due to leaks at 35 percent or greater, our solution provides a significant opportunity to address water loss. ePIPE applicators save their customers time and money with ePIPE’s fast installation. Protecting underground water carrying pipes including lead service lines (LSLs) can be completed in under four hours per line and often with no excavation on the home owner’s property.”
Pipes protected with ePIPE reduce the loss of water and reduce the leaching of toxic lead and copper into drinking water to well below U.S. Environmental Protection Agency and World Health Organization cut-off levels. Pipes from as small as 1/2” in diameter can be protected in-place using the patented ePIPE system and materials.
Related News
From Archive

- 290-mile gas pipeline expansion proposed across Georgia, Alabama and South Carolina
- City of Albuquerque halts fiber optic construction in response to damage, complaints
- Body retrieved day after fatal trench collapse at Bakersfield, Calif., job site
- $227 million Garnet Valley water project advances, set to create 73,000 jobs in Nevada
- Pasadena, Calif., undergrounding project could take 500 years to finish
- Gehl and Mustang offer world’s largest skid loader
- Growing Pains and Gains
- Authorities investigating trench collapse that killed worker in Ashburn, Va.
- City of Albuquerque halts fiber optic construction in response to damage, complaints
- Pasadena, Calif., undergrounding project could take 500 years to finish
Comments