Standing Rock Tribe Completes Rural Water Supply Pipeline
FORT YATES, N.D. (AP) – The Standing Rock Sioux Tribe has completed a pipeline connecting the North Dakota and South Dakota portions of a rural water delivery system.
The tribe completed the pipeline with help from the Bureau of Reclamation. The pipeline is part of the Standing Rock Rural Water Supply System.
Standing Rock Chairman Dave Archambault says construction of the water treatment plant, the new water intake and miles of pipe ensures “safe, clean and reliable drinking water” for tribal members.
Bureau of Reclamation area manager Arden Freitag says the project will stabilize the water supply for communities on the northern part of the reservation. The project replaces an intake that failed in 2003 and an aging water treatment plant.
A public valve-turning to celebrate the pipeline’s completion is scheduled Thursday in Fort Yates.
Related News
From Archive
- OSHA investigates fatal trench collapse at Conroe construction site
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Texas811 launches real-time excavation detection to prevent utility strikes
- Oil pipeline struck during fiber optic construction spills into L.A. storm drains
- Fiber drilling strike triggers major sewer failure, lawsuits in Florida
- Texas811 launches real-time excavation detection to prevent utility strikes
- Race Communications breaks ground on Bakersfield fiber network
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Inside Infrastructure: Utility locators warn of systemic failures in damage prevention process
- Senate passes PIPELINE Safety Act aimed at strengthening buried utility protection

Comments