Texas Town Receives $455,000 for Water Pipeline Replacement Project
8/25/2017
The Texas Water Development Board (TWDB) has approved financial assistance in the amount of $455,000 from the Drinking Water State Revolving Fund to the city of Booker.
The city will use the assistance to finance the planning, design, and construction costs associated with water system improvements, including the replacement of approximately 4,300 feet of pipeline throughout its service area. The project will help reduce water loss within the system.
The TWDB administers cost-effective financial assistance programs for the construction of water supply, wastewater treatment, flood control, and agricultural water conservation projects.
Related News
From Archive
Sign up to Receive Our Newsletter
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized
- Alaska LNG pipeline could require 7,000 workers at peak construction, developers say
- Ohio trench collapse kills one worker, injures two during pipe installation
- Philadelphia-Camden sewers spill 12 billion gallons of sewage a year into local waterways, report finds
- California invests $590 million to boost water reliability, upgrade sewer systems statewide
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized
- Massive water line failure leaves majority of Waterbury without service
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year

Comments