Roadway Reopening at Site of Massive Michigan Sinkhole
FRASER, Mich. (AP) — A roadway that was closed after a sewer line collapse caused a massive suburban Detroit sinkhole has reopened to traffic.
A ribbon-cutting took place for 15 Mile Road in Fraser at the site of the Christmas Eve collapse before it reopened Tuesday morning. Macomb County Public Works Commissioner Candice Miller credited engineers, construction crews and others for their contributions.
The county says it’s the last major step in the completion of the $75 million repair project.
Sewage earlier began flowing again through the major interceptor line and officials marked the milestone during a September ceremony.
The line 60 feet (18 meters) below ground serves roughly 500,000 Macomb County residents.
Families from roughly two dozen homes were displaced for about three weeks after the collapse and three houses were condemned.
Related News
From Archive
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion

Comments