Teen Rescued After Fall into Drainage Pipe at Los Angeles Park
LOS ANGELES (AP) — A 13-year-old boy who fell into a drainage pipe during an Easter outing at a Los Angeles park was rescued alive early Monday after an overnight search of the underground system, authorities said. The boy spent at least 12 hours in the system before he was found.
“We located Jesse Hernandez alive and talking,” fire Capt. Erik Scott announced before dawn. “We were able to give him a cellphone to even contact his family members (who) as you can imagine are overwhelmed with joy.”
The search began around 4:30 p.m. Sunday when the Fire Department received reports that the boy had fallen about 25 feet (8 meters) down a pipe at the city’s sprawling Griffith Park.
The Los Angeles Times reported that Jesse and cousins were jumping on wooden planks in an abandoned maintenance building when one of the planks broke and he fell.
The drainage system is part of a network that of pipes 4 feet (1.2 meters) in diameter that runs parallel to the Los Angeles River and crosses under freeways.
Numerous agencies joined the Fire Department, including the sanitation and engineering bureaus. Cameras that are normally used for pipe inspections and can both float and crawl were sent into the pipes.
About 2,400 feet (731 meters) of pipe had been inspected when Bureau of Sanitation workers opened a hatch to lower a camera near the intersection of two freeways and found the boy 12 hours after the search began.
He was treated by paramedics and taken to a hospital for a medical evaluation.
Related News
From Archive
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion

Comments