Shawcor expands spoolable composite pipe, underground fuel, water storage capabilities
(UI) – Shawcor Ltd. will be expanding its Composite Systems segment production capabilities in the US with commitments for two new operating facilities. Capital expenditures for these operating facilities are expected to represent, in the aggregate, approximately $60 million across 2023 and 2024.
These facilities will expand the company’s capability to deliver premium spoolable composite pipe and market-leading underground fuel and water storage tanks, more specifically 1) an additional production facility for its Flexpipe business, located in Texas. The Flexpipe business manufactures premium flexible fiberglass reinforced composite pipe used for oil and gas gathering and water disposal lines, carbon dioxide injection lines and other applications requiring corrosion resistance and high-pressure capabilities, and 2) an additional production facility for its Xerxes business, located in South Carolina. The Xerxes business manufactures market-leading fiberglass reinforced plastic underground storage tanks, primarily used within the retail fuel, storm water and wastewater markets.
Both facilities will be populated in a phased manner, are expected to be operational by the end of 2024 and to approach normalized levels of production in 2026. The company believes that, in combination, these facilities, with initial equipment installations, have the potential to enable over $100 million of incremental annual revenue generating capacity as they approach efficient utilization levels.
“The strategic placement of these new facilities positions our Flexpipe business closer to our US customer base and expands Xerxes’ ability to serve the eastern-US market with underground storage tanks. The added scale will serve to unlock additional revenue generating capacity, and the efficiencies of these new plants should, over time, enhance the margin profile of the segment,” said Martin Perez, President of Shawcor’s Composite Systems segment.
Related News
From Archive
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized
- Alaska LNG pipeline could require 7,000 workers at peak construction, developers say
- Ohio trench collapse kills one worker, injures two during pipe installation
- Elon Musk's Boring Co. fined for dumping drilling waste into Vegas sewer system
- $1.4 billion Midwest pipeline expansion to move more Canadian oil to U.S. Gulf
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized
- Massive water line failure leaves majority of Waterbury without service
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines

Comments