Vac-Con releases new non-CDL Titan sewer cleaning truck
(UI) — Vac-Con has introduced its non-CDL Titan three-yard combination sewer cleaning truck, which provides the performance expected from the premium line of Vac-Con machines in a compact configuration.
This model is an ideal option for smaller municipalities and contractors and those who need the ability for anyone on the team to jump in the truck and go — no CDL required. This is a premium unit for the masses.
The non-CDL Titan weighs under 26,000 GVWR with full freshwater tanks and features three-yards of usable capacity in the debris body. A simple operating system is designed for operators of all skill levels to comfortably run the machine in the field.
Notable standard features include:
- Positive displacement blower rated up to 2,100 CFM at 16-inch Hg
- Lightweight aluminum water tanks with 500-gallon capacity
- 30 GPM at 3,000 PSI water system
- Titan style 60-inch diameter debris tank
- Improved Titan filtration with cyclone separator and final filter
- Hose reel rotates 180-degrees with capacity of 500-ft. x ¾-in. hose
- Boom rotates 180-degrees and extends 5-ft. with a lifting capacity of 500-lbs. at full extension
“Vac-Con continues to meet customer requirements by innovating and expanding our product offering,” Bryce Rieger, national sales manager, said. “The non-CDL Titan fills the gap in an evolving industry where operator skills range from beginner to expert. Anyone can drive and operate this machine, which empowers our customers with the flexibility they need to get the job done.”
The non-CDL Titan is available now for demonstrations.
Related News
From Archive
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized
- Alaska LNG pipeline could require 7,000 workers at peak construction, developers say
- Ohio trench collapse kills one worker, injures two during pipe installation
- Elon Musk's Boring Co. fined for dumping drilling waste into Vegas sewer system
- $1.4 billion Midwest pipeline expansion to move more Canadian oil to U.S. Gulf
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized
- Massive water line failure leaves majority of Waterbury without service
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines

Comments