Watchdog group calls for complete overhaul of New Orleans Sewerage & Water Board structure
(UI) – The Louisiana Illuminator reported that the Bureau of Governmental Research (BGR) watchdog group has called for a “complete overhaul” of the New Orleans Sewerage & Water Board’s governance structure.
According to the report, the Sewerage & Water Board’s “unique” governing structure is responsible for several critical issues, including failing flood protection, boil-water notices and rising costs associated with a struggling billing system. The report also described board as an “odd mix” of a state-run agency and municipal water department under the control of the city government. BGR’s’ President and CEO Rebecca Mowbray said that the structure “is a complicated web of competing interests and weak accountability that works against long-term performance,” the Louisiana Illuminator reported.
BGR’s report states that state control makes enacting change challenging, and city council involvement leaves financial decisions vulnerable to political influence.
The report offered two redesign options to overhaul the current structure: reforming the existing board or replacing it with a city water department. While the first option is “easier,” the second would solve more problems. Either option would help ease burdens the ineffective structure that city officials have been asking to change for decades.
Related News
From Archive
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion

Comments