U.S. DOJ urges appeals court to reconsider forcing Enbridge to drain parts of Line 5 oil pipeline
(UI) – According to Reuters, the Biden administration is pushing courts to “rethink” an order that requires Canada’s Enbridge to drain parts of its Line 5 oil pipeline. The pipeline runs through Wisconsin on tribal land.
In a public court filing, the U.S. Department of Justice (DOJ) asserted to the 7th U.S. Circuit Court of Appeals that draining parts of the Line 5 oil pipeline could violate a 1977 treaty that keeps oil flowing between the U.S. and Canada.
Canada has previously argued that the pipeline should remain online due to the treaty. The United States, while agreeing that Enbridge is trespassing on Native American land, is urging the court to reconsidering ordering the Canadian pipeline operator to close parts of Line 5 by 2026.
The Bad River Band of Lake Superior Chippewa brought Enbridge to court in 2019 over trespassing allegations and is calling for an “immediate end to Enbridge’s ongoing trespass.”
However, Enbridge claims that shutting the Line 5 pipeline down would be bad for public interest, and has offered the tribe $80 million to keep oil flowing and settle the dispute.
An Enbridge spokesperson said shutting the 540,000-bpd pipeline would not be in the public interest, and that the company continues to seek a solution that would not disrupt the flow of oil. The company has offered the Band $80 million to settle the dispute.
This story was originally reported by Reuters.
Related News
From Archive
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion

Comments