Woolpert secures $5.4 million stormwater management contract in South Carolina
(UI) — The South Carolina Department of Transportation has selected Woolpert to provide compliance services under a five-year, $5.4 million contract supporting SCDOT’s municipal separate storm sewer system (MS4) program. MS4 permits are designed to prevent stormwater runoff from funneling harmful pollutants into local surface waters. The National Pollutant Discharge Elimination System’s stormwater program regulates stormwater discharges from sources including MS4s, construction, and industrial activities.
Under this contract, Woolpert will provide services throughout the state related to every aspect of stormwater management, including the development of stormwater quality design standards and specifications, illicit discharge detection and elimination, erosion and sediment control, post-construction water quality, monitoring, and public education.
Woolpert Vice President and Program Director Brian Bates said that the latest contract is the continuation of a long-term working relationship. Woolpert has been providing geospatial and engineering services for SCDOT since 2005, including the development of compliancy standards and manuals, monitoring and illicit discharge detection, and outfall inventory programs.
The standards will be publicly available and used by other local and state agencies as part of their permitting processes and South Carolina’s statewide commitment to using best management practices to trap pollutants and prevent pollution by controlling stormwater quality at its source.
“Together, SCDOT and Woolpert have developed an MS4 program for the state of South Carolina that is one of the best in the nation,” SCDOT Stormwater Manager Jackie Williams said. “A tremendous body of work was accomplished in the past 18 years that would not have been possible without the brilliant and dedicated Woolpert staff. The SCDOT stormwater section is extremely appreciative of the engineers at Woolpert who have become more than contracted consultants, they are valued partners and friends.”
The contract is currently underway.
Related News
From Archive

- HDD industry faces challenges as cities push back on fiber drilling disruptions
- 2 workers killed, 1 injured while working on sewer line in Mobile, Ala.
- Tunnel boring continues under Chesapeake Bay for $3.9 billion HRBT Expansion project
- $5.3 billion, 516-mile pipeline to connect Texas to Arizona through New Mexico
- Judge approves construction for key portion of $485 million pipeline in Larimer County, Colo.
- New products: Latest industry developments
- 31 workers rescued after LA tunnel partially collapses
- Ohio Supreme Court rules sewer line location isn’t a ‘defect’ in property dispute
- Faulconer Construction begins rock blasting for water pipeline project in Charlottesville, Va.
- $5.3 billion, 516-mile pipeline to connect Texas to Arizona through New Mexico
Comments