Radiodetection, Trimble collaborate to improve underground utility mapping accuracy
(UI) – Radiodetection and Trimble are collaborative to bring survey-grade accuracy to underground utility mapping. Through the integration of Radiodetection’s RD Map+ application and precision locator products with the Trimble Catalyst DA2 GNSS system, the solution streamlines utility-locating workflows to provide high-accuracy measurement capabilities to create underground utilities maps in a single field operation.

Data collected with the Radiodetection’s RD Map+ app and precision locators automatically sync with high-accuracy location measurements collected by the Trimble Catalyst DA2 GNSS system. By streamlining this connection, field workers can accurately digitize underground utility-line locations and reduce reporting errors.
This integration advances utility measurement workflows by giving workers the capability to accurately represent the utility asset in a digital format. This streamlines the operation, maintenance and construction process whenever utilities are involved.
“Accurate geolocation is critical to the operation and maintenance of underground utilities and public infrastructure,” said Stephanie Michaud, Strategic Marketing Manager, Trimble Surveying & Mapping Field Solutions. “By adding survey-grade capabilities to existing utility workflows, this collaboration creates a connected solution that provides confidence and reliability during the data capture process.”
Related News
From Archive

- 290-mile gas pipeline expansion proposed across Georgia, Alabama and South Carolina
- City of Albuquerque halts fiber optic construction in response to damage, complaints
- Body retrieved day after fatal trench collapse at Bakersfield, Calif., job site
- $227 million Garnet Valley water project advances, set to create 73,000 jobs in Nevada
- Pasadena, Calif., undergrounding project could take 500 years to finish
- Gehl and Mustang offer world’s largest skid loader
- Growing Pains and Gains
- Authorities investigating trench collapse that killed worker in Ashburn, Va.
- City of Albuquerque halts fiber optic construction in response to damage, complaints
- Pasadena, Calif., undergrounding project could take 500 years to finish
Comments