Pennsylvania town receives $6.4 million for wastewater treatment upgrades
(UI) – Sen. Judy Ward (R-30) and Rep. Kerry Benninghoff (R-171) have announced that Bratton Township will receive over $6.4 million in state funding to upgrade its wastewater treatment plant.
“Clean water and efficient water treatment is one of the most vital needs a community has,” Ward said. “This PENNVEST funding will help Bratton Township continue to provide this necessary service and create a clean and safe community for its residents.”
The project includes constructing a new building to screen incoming wastewater and installing new treatment tanks at the wastewater treatment plant. Additionally, two pump stations will be replaced, and the existing ultraviolet disinfection system will be upgraded.
“The award by PENNVEST will allow residents to avoid an 180% increase in user fees,” Benninghoff stated. “This is an extensive but much-needed overhaul in the township’s infrastructure, in addition to being a necessary investment in the health and safety of our community.”
The funding consists of a loan of more than $900,000 and nearly $5.5 million in grants that do not require repayment. The 20-year loan carries a 1% interest rate.
The Pennsylvania Infrastructure Investment Authority (PENNVEST) provides this funding to assist with sewer, stormwater, and drinking water projects across the commonwealth.
Related News
From Archive
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion

Comments