Crossbores
Editor’s Log: Old problems, redux
In this month’s Editor’s Log, Editor-in-Chief Robert Carpenter delves into the growing tension between fiber optic installations and aging underground infrastructure in Katy, Texas. As the city halts fiber projects over repeated water line strikes, Carpenter explores the broader implications for utility safety, contractor responsibility, and the need for better locating practices nationwide.
Unusual Sliplining Solutions Developed on Los Angeles Project
Rehabilitating or replacing large-diameter sewer lines in heavily populated areas always is a challenge: heavy traffic complicates work and causes disruptions and traffic delays, creating a ripple affect extending far beyond the construction zones.
CUES Releases PICS Cross Bore Inspection Camera
The new CUES Pullback Inspection Camera System (PICS) 2-inch to 4-inch bore hole inspection camera helps eliminate cross bores in directional drilling operations. Its robust inspection capabilities provide a powerful way to inspect, assess, mitigate, record and manage HDD operations. PICS is compat..
Cross Bore Analysis Review of Best Practices And Changing Trenchless Market
Since the first cross bore discovery in Kenosha, WI, in 1976, investor-owned utilities and municipalities have completed substantial research and discovery into cross bore prevention, trenchless construction innovation and safety awareness. As trenchless technology has improved, the ability of the c..
Fort Worth, Atmos Team-Up For Crossbore Prevention
The city of Fort Worth, TX, and Atmos Energy, the area’s gas service provider, are taking a proactive approach to address possible crossbores in the city’s sanitary sewer pipes. Crossbores – an intersection of two or more underground utilities – is an ongoing concern of municipalities across the co..
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- PHMSA warns of heat risks in aging plastic gas distribution pipelines following deadly Pennsylvania explosion
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- OSHA seeks $1.2 million fine after fatal trench collapse in Connecticut
- Phase 1 Alaska LNG pipeline advances with construction awards, pipe supply agreements
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- NWPX grows water infrastructure portfolio with Colorado precast facility
