Pipelines
HDR Publishes Guide for Condition Assessment, Rehabilitation of Water/Wastewater Infrastructure
HDR has developed Condition Assessment and Rehabilitation Guide, a 40-page booklet that outlines tools and technologies for inspection, assessment and renewal of water and wastewater infrastructure.
Quadex’s Stag Technologies Division Transitioning into Materials Development Group
As part of its long-term growth strategy, Quadex LLC, a division of the Vortex Companies, is renaming and positioning its Stag Technologies division as its Materials Development Group.
TT Technologies’ Versatile Grundoburst: First Choice for Wide-Ranging Applications
Burst and replace water, sewer, gas and other pipes with the Grundoburst static pipe bursting system from TT Technologies. The Grundoburst can pull in a variety of replacement pipe including PVC, DIP, ABS, cast iron, fusion-welded HDPE and VCP jacking pipe.
Perma-Liner Rolls Out Road Shows, New Product for Tackling Infrastructure Rehab
With aging infrastructure and broken sewer lines being common themes that more and more communities are experiencing, Perma-Liner Industries LLC hosted events to share innovative, trenchless technology, and state-of-the-art equipment and materials to tackle these issues in the least disruptive manner.
Stormwater Pipe Replacement in Florida
Communities large and small across the United States are facing a hidden crisis – failing underground water and sewer pipes.
New Jersey Gas Utility Pipeline Project Named Project of the Year
A $900 million gas main upgrade project responsible for upgrading over 500 miles of gas lines has been named as Project of the Year by the Project Management Institute - New Jersey Chapter.
New Orleans Could Get Up to $111 Million Loan for Sewer Upgrades
The U.S. Environmental Protection Agency is considering a $111 million loan for the City New Orleans to help upgrade and improve its aging sewer infrastructure.
Stricter EPA Lead Rule Could Boost Water Pipe Replacement Demand
The Environmental Protection Agency (EPA) announced proposed updates to its lead rule for drinking water that could add demand for pipeline replacement projects throughout the United States.
Brooklyn Residents Upset Over “Massive Havoc” Caused by Infrastructure Project
Hundreds of residents in the Brooklyn are of New York City attended a meeting recently to voice their frustration over the disruptions caused by utility companies working on an infrastructure improvement project.
FERC Issues Final HDD Monitoring, IR Response Guidance
FERC's Office of Energy Projects has released its final Guidance for Horizontal Directional Drill Monitoring, Inadvertent Return Response, and Contingency Plans. The 15-page reference is available for download.
Columbia Gas Ordered to Seek State Approval for All Non-Emergency Work
Massachusetts officials are placing additional restrictions on the utility company blamed for last year’s destructive gas explosions following a major gas leak that prompted evacuations last week.
Queens, New York Breaks Ground on $139 Million Upgrade Project
A New York neighborhood has broken ground on a $139 million renovation across 25 blocks which will include, among other things, several miles of sewer and water infrastructure upgrades.
Volunteers Canvass Newark in Service Line Replacement Push
Volunteers have been going door-to-door in Newark, New Jersey, to help sign up thousands of residents to have their corroding lead service lines replaced.
Enbridge Installing Supports for Great Lakes Oil Pipeline
Enbridge says it has begun installing steel supports on an oil pipeline in Michigan's Straits of Mackinac, where erosion has created a gap between the line and the lake bottom.
PLCS
Pushing or pulling new PE pipe into a host pipe using winches, slings on a backhoe bucket or plain brute strength is slow, labor intensive, potentially dangerous and risks damaging the PE pipe. PLCS’s Pipe Handler easily grip..
Though Challenging, HDD Intersect Project is Effective Solution
Directionally drilled intersects – two drill units drilling pilot holes from opposite ends of a planned bore path that intersect – are not unusual today, but hardly could be described as routine. The complexities of an intersect and consequences of failure deter most horizontal directional drilling (HDD) contractors from entering this highly specialized market.
Saudi Arabia Spending Nearly $830 Million in Water Upgrades Ahead of Heavy Tourist Season
In anticipation of a large tourist season this year, Saudi Arabia is spending $825 million to upgrade its water infrastructure in the city of Mecca along with other holy sites.
Efficiency Production Unveils Octagon-Configured Build-A-Box Trench Shield
Efficiency Production unveiled the newest innovation in its industry-leading Build-A-Box Modular Aluminum Trench Shielding System.
CUIRE Laboratory Receives a 330-kip Actuator
In February, CUIRE purchased a 330-kip actuator from MTS Company for its soil box testing of underground pipes. This actuator will be used for the NCHRP SAPL Project to develop structural design methodology for Spray Applied Pipe Liners (SAPLs) in gravity stormwater conveyance conduits through actual size soil box testing.
Aegion Corporation Awarded $5.7 Million Wastewater Pipeline Rehabilitation Contract in Montgomery, Alabama
Aegion Corporation has announced that its subsidiary, Insituform Technologies, LLC, has been awarded a $5.7 million wastewater pipeline rehabilitation contract in Montgomery, Alabama.
GAS - Tellurian (1)
United States Tellurian Project: Delhi Connector Pipeline (DCPL) Capacity: 2 Bcf/d Location: Southwest Louisiana Dimensions: 180 miles of 42-inch gas pipeline Completion: 2023 (work to begin 2021) Comments: Tellurian began a binding open season for the Delhi Connector, connecting the Perryvil..
NGL - SemCAMS Midstream and Keyera
Canada SemCAMS Midstream and Keyera Project: Canada Liquids Pipeline System Location: Northern Midland Basin Capacity: 100,000 bpd, expandable to 200,000 bpd Dimensions: 171 miles (275 km); 16-inch condensate, 12-inch NGL pipelines. Completion: 2022 Comments: The pipeline will connect the liq..
NGL - Targa
United States Targa Project: Grand Prix extension Location: Oklahoma Length: 110 miles Capacity: 120,000 bpd Completion: 1Q 2021 Comments: From southern Oklahoma into the Sooner Trend (oil field), Anadarko (basin), Canadian and Kingfisher (counties) “STACK” region of Central Oklahoma, where i..
NGL - Williams
United States Williams Project: Bluestream Pipeline Location: Kansas and Oklahoma Length: 188 miles Capacity: “significant volumes” Completion: 1Q 2021 Comments: Connecting fractionator in Conway, Kan. to southern terminus of Overland Pass Pipeline...
OIL - Rangeland Midstream Canada
Canada Rangeland Midstream Canada Project: Marten Hills Pipeline System Capacity: Not determined Location: Northcentral Alberta Dimensions: 53 miles of crude and condensate pipeline Completion: 2Q 2020 Comments: The system will gather crude oil production from the Clearwater formation, which ..
OIL - Navigator Energy Services
United States Navigator Energy Services Project: Glass Mountain System Expansion Location: Oklahoma (to Cushing) Length: 70 miles Capacity: 750,000 bbl. additional capacity Completion: 3Q 2019..
GAS - Tellurian
United States Tellurian Project: Haynesville Global Access Pipeline (HGAP) Capacity: 2 Bcf/d Location: Southwest Louisiana Dimensions: 160 miles of gas pipeline. Completion: 2Q 2023 (work to begin 2022) Comments: Tellurian is currently seeking shippers for its pipeline and production faciliti..
Family of Teen Killed During Gas Explosions Settles Lawsuit
The family of a high school student who was killed during a series of natural gas explosions in Massachusetts last year has reached a settlement with the utility involved in the disaster, a lawyer for the family and the company announced.
ClockSpring|NRI Adds Milliken Infrastructure Solutions to its Portfolio
ClockSpring|NRI has acquired Milliken Infrastructure Solutions, LLC, previously a subsidiary of Milliken & Company.
SoCalGas Delays Return of California Gas Pipeline
Southern California Gas Co (SoCalGas) has delayed the estimated return of a natural gas pipeline until July 29 from July 5 after finding a couple of pipeline leaks in remote areas of the desert that the company said were "non-hazardous."
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion
