Clearfield's Fiber Optic Technology Now Telcordia Certified

Clearfield, Inc. today announced that its fiber termination process used to manufacture Clearfield LC/UPC 900 μm 1.6 mm and 2.0 mm jumpers and fiber assemblies have been tested by an independent test lab compliant to the Telcordia, GR-326-Core requirements. With the Telcordia GR-326 achievement, the company now provides maximum assurance for the Tier 1 telecommunications market that requires the highest standards for manufacturing processes, procedures and quality components.
As major service providers seek to provide higher density in their networks with a smaller form factor connector, many opt to use LC/UPC jumpers and fiber assemblies in an Outside Plant (OSP) environment. The Clearfield LC/UPC connectors surpassed rigorous testing to meet a myriad of environmental, handling, use and mechanical functions to survive the stresses in the OSP environment.
“Successfully securing the certifications required to meet the needs of national carriers and cable operators is a sign that our strategy and execution is working,” said Cheri Beranek, Clearfield President and CEO. “It is yet another sign that we are well-positioned to build the infrastructure needed for Internet of Things device connectivity, 5G and our fiber-driven future.”
Related News
From Archive

- NTSB publishes preliminary report on fatal gas pipeline explosion in Lexington, Mo.
- 290-mile gas pipeline expansion proposed across Georgia, Alabama and South Carolina
- Ripple Fiber breaks ground on $140 million project, expanding into central Mass.
- City of Albuquerque halts fiber optic construction in response to damage, complaints
- Body retrieved day after fatal trench collapse at Bakersfield, Calif., job site
- Gehl and Mustang offer world’s largest skid loader
- Growing Pains and Gains
- Maryland lawmakers push to curb BGE pipeline spending, citing safety and cost concerns
- Authorities investigating trench collapse that killed worker in Ashburn, Va.
- City of Albuquerque halts fiber optic construction in response to damage, complaints
Comments