First Fill: Water Unleashed into McCook Reservoir for First Time
On Jan. 11, 2018, for the first time, water came gushing into the Metropolitan Water Reclamation District of Greater Chicago’s (MWRD’s) McCook Reservoir, demonstrating a fully functioning system designed to prevent polluted water from entering local waterways and mitigate area flooding.
The reservoir started to take on water at approximately 9:30 a.m. from the Mainstream Tunnel System just minutes after the gates were opened from the tunnel. The initial inflow of water entering the reservoir was 263 million gallons of water, accounting for mainly rain water and snowmelt. With forecasts calling for additional rain, more water was expected throughout the day.
“Yesterday’s initial flow of water may only climb up a small portion of the sprawling 300-foot walls of the reservoir, but this first fill reveals a working system that will protect our waterways from untreated water and our streets and basements from flooding,” said MWRD President Mariyana Spyropoulos.
The reservoir will contain water that formerly flowed directly into area waterways before it could be treated and cleaned. This stored water in the reservoir will be pumped from the reservoir to the Stickney Water Reclamation Plant to be cleaned and released when the treatment plant has capacity to treat the water after significant rain events.
Stage I of the McCook Reservoir can hold 3.5 billion gallons of storage capacity and will protect residents of Chicago and 36 suburban communities from flooding. It will provide an estimated $114 million per year in flood reduction benefits.
Funded by the MWRD and the U.S. Army Corps of Engineers, McCook Reservoir is located along the Stevenson Expressway between the Des Plaines River and Chicago Sanitary and Ship Canal. It is part of the MWRD’s Tunnel and Reservoir Plan (TARP), one of the country’s largest public works projects for pollution and flood control. TARP covers a 375-mile area that includes Chicago and 51 suburbs that rely on a combined collection system that conveys both stormwater and used water.
Related News
From Archive
- U.S. water reuse boom to fuel $47 billion in infrastructure spending through 2035
- Major water pipe break in Puerto Rico hits over 165,000 customers
- Potomac River Tunnel project enters construction phase beneath Washington, D.C.
- U.S. Army Corps approves Enbridge's $500 million Line 5 Tunnel project
- Mexico accelerates $6.7 billion water infrastructure plan amid U.S. water disputes
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines
- Trump's tariffs drive $33 million cost increase for Cincinnati sewer project
- CASE Launches New Equipment Configurator At CaseCE.com
- Utah city launches historic $70 million tunnel project using box jacking under active rail line

Comments