New Pipeline Regulations Approved in Virginia
Virginia Governor Ralph Northam today approved additional powers to expand the state’s ability to protect clean water during the building of pipelines. SB698 and SB699 establish processes in state law to allow the Virginia Department of Environmental Quality (DEQ) to issue a stop work order on all or part of land-disturbing activities associated with natural gas pipeline construction if DEQ determines those activities have caused, or will imminently cause, a substantial adverse impact to water quality. On Saturday, the General Assembly accepted Governor Northam’s amendment adding an emergency clause to each bill and the measures are currently in effect.
“If the pipelines go forward, it’s imperative that DEQ have the tools it needs to assure the people of the Commonwealth that water quality will not be compromised,” said Virginia Senator Creigh Deeds. “Thanks to DEQ staff for their tireless work to help get these bills through the legislative process, to Governor Northam for his timely amendments and for signing the bills, and to the conservation groups who added their voices to this important conversation.”
Related News
From Archive
- OSHA investigates fatal trench collapse at Conroe construction site
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Texas811 launches real-time excavation detection to prevent utility strikes
- Oil pipeline struck during fiber optic construction spills into L.A. storm drains
- Fiber drilling strike triggers major sewer failure, lawsuits in Florida
- Fatal trench collapse in Mass. leads to $4.6 million OSHA penalty, dozens of violations
- Texas811 launches real-time excavation detection to prevent utility strikes
- Race Communications breaks ground on Bakersfield fiber network
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Inside Infrastructure: Utility locators warn of systemic failures in damage prevention process

Comments