Shell reaches FID on Polaris, Atlas carbon capture projects in Canada
(UI) – Shell Canada Products, a subsidiary of Shell plc, announced the Final Investment Decision (FID) for Polaris, a carbon capture project at the Shell Energy and Chemicals Park, Scotford in Alberta, Canada.
Polaris is designed to capture approximately 650,000 tonnes of CO2 annually from the Shell-owned Scotford refinery and chemicals complex.
In addition to the Polaris FID, Shell announced FID to proceed with the Atlas Carbon Storage Hub in partnership with ATCO EnPower. The first phase of Atlas will provide permanent underground storage for CO2 captured by the Polaris project.
CO2 emissions captured by Polaris will be sent to the Atlas Hub via an approximately 22-kilometre pipeline to two storage wells. CO2 will be stored there approximately two kilometres underground in the Basal Cambrian Sands, the same formation used to successfully store CO2 from the Quest CCS facility.
"Carbon capture and storage is a key technology to achieve the Paris Agreement climate goals," said Huibert Vigeveno, Shell's Downstream, Renewable and Energy Solutions Director. "The Polaris and Atlas projects are important steps in reducing emissions from our own operations."
Related News
From Archive
- OSHA investigates fatal trench collapse at Conroe construction site
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Texas811 launches real-time excavation detection to prevent utility strikes
- Oil pipeline struck during fiber optic construction spills into L.A. storm drains
- Fiber drilling strike triggers major sewer failure, lawsuits in Florida
- Fatal trench collapse in Mass. leads to $4.6 million OSHA penalty, dozens of violations
- Texas811 launches real-time excavation detection to prevent utility strikes
- Race Communications breaks ground on Bakersfield fiber network
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Inside Infrastructure: Utility locators warn of systemic failures in damage prevention process

Comments