UCTV
No Wipes Down the Pipes
27 May 2020
Water Utility Inspection
18 July 2018
Caterpillar EU Stage IV Compliant Engines
6 July 2018
LiuGong 922E Excavator
6 July 2018
Ditch Witch JT40 Horizontal Directional Drill
12 June 2017
McElroy Acrobat 160
9 June 2017
Lateral Sewer Line Point Repair
3 March 2017
Bobcat E32 Walkaround
13 February 2017
Sign up to Receive Our Newsletter
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- PHMSA warns of heat risks in aging plastic gas distribution pipelines following deadly Pennsylvania explosion
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- OSHA seeks $1.2 million fine after fatal trench collapse in Connecticut
- Worm-like robot burrows underground to cut power line installation costs
- First tunnel boring machines complete testing for Hudson Tunnel Project
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- NWPX grows water infrastructure portfolio with Colorado precast facility
