Pipeline open-cut
Steering Through Sandy Soils to Upgrade City Sewer System
Sewer / Sewer Construction / Equipment / Auger boring / Features / Open-cut / Pipe / Pipeline Construction / Pipeline open-cut / Pipeline Trenching / Pipelines / Underground Infrastructure / Underground Construction
The economy in Garden City, Kan., is strong with the recent opening of a Dairy Farmers of America plant. Approximately 4 million pounds of milk from regional farmers makes its way to the plant each day, which has led to expansion for many other companies throughout the area. To keep up with the expected growth from the dairy industry and retail stores being constructed nearby, Garden City is upgrading existing utilities to ensure they are prepared to handle current and future needs.
Sign up to Receive Our Newsletter
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- PHMSA warns of heat risks in aging plastic gas distribution pipelines following deadly Pennsylvania explosion
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- OSHA seeks $1.2 million fine after fatal trench collapse in Connecticut
- Worm-like robot burrows underground to cut power line installation costs
- First tunnel boring machines complete testing for Hudson Tunnel Project
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- NWPX grows water infrastructure portfolio with Colorado precast facility
