Pipeline open-cut
Steering Through Sandy Soils to Upgrade City Sewer System
Sewer / Sewer Construction / Equipment / Auger boring / Features / Open-cut / Pipe / Pipeline Construction / Pipeline open-cut / Pipeline Trenching / Pipelines / Underground Infrastructure / Underground Construction
The economy in Garden City, Kan., is strong with the recent opening of a Dairy Farmers of America plant. Approximately 4 million pounds of milk from regional farmers makes its way to the plant each day, which has led to expansion for many other companies throughout the area. To keep up with the expected growth from the dairy industry and retail stores being constructed nearby, Garden City is upgrading existing utilities to ensure they are prepared to handle current and future needs.
Sign up to Receive Our Newsletter
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion
