Hearings Scheduled for Gas Distribution Project
BLUE ASH, Ohio (AP) – Two key hearings have been set to discuss if a proposed natural gas pipeline can be built under Cincinnati’s suburbs.
The Cincinnati Enquirer reports (http://cin.ci/2ou6x8a ) a public hearing June 15 at the University of Cincinnati-Blue Ash campus will allow citizens to express thoughts on the proposed 13-mile long pipeline planned to run under multiple suburbs in northern Cincinnati.
A number of community organizations have already announced that they will oppose the pipeline project.
An adjudicatory hearing is set July 12 in Columbus.
Duke Energy says it wants to extend the pipeline to increase the reliability of natural gas delivery in central Cincinnati.
Another energy company, IGS Energy, has asked to intervene in support of the pipeline project that would begin near the intersection of Butler, Warren and Hamilton counties.
Related News
From Archive
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- U.S. water reuse boom to fuel $47 billion in infrastructure spending through 2035
- $2.3 billion approved to construct 236-mile Texas-to-Gulf gas pipeline
- Major water pipe break in Puerto Rico hits over 165,000 customers
- Potomac River Tunnel project enters construction phase beneath Washington, D.C.
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines
- Trump's tariffs drive $33 million cost increase for Cincinnati sewer project
- Utah city launches historic $70 million tunnel project using box jacking under active rail line
- Tulsa residents warned after sewer lines damaged by boring work
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized

Comments