Pure Technologies Awarded Sewer, Water Inspection Contract in D.C.
The District of Columbia Water and Sewer Authority (DC Water) has awarded Pure Technologies’ wholly-owned subsidiary, Pure Technologies U.S. Inc., a contract worth up to $10 million over 5 years for condition assessment of their major water and sewer pipelines.
Using its proprietary technologies and solutions, the company will collect new pipeline inspection and condition data and work with DC Water’s asset management division to integrate this information into their existing data management systems. Pure Technologies will also provide data analysis and recommend pipeline rehabilitation options for large diameter water pipelines and major sewers in Washington, DC.
The new contract expands on prior work, conducted by the company over the past 3 years, which included pipeline condition assessment and developing a pipeline risk prioritization and management program that enabled DC Water to cost effectively manage their critical pipelines.
Related News
From Archive
- OSHA investigates fatal trench collapse at Conroe construction site
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Texas811 launches real-time excavation detection to prevent utility strikes
- Oil pipeline struck during fiber optic construction spills into L.A. storm drains
- Fiber drilling strike triggers major sewer failure, lawsuits in Florida
- Fatal trench collapse in Mass. leads to $4.6 million OSHA penalty, dozens of violations
- Texas811 launches real-time excavation detection to prevent utility strikes
- Race Communications breaks ground on Bakersfield fiber network
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Inside Infrastructure: Utility locators warn of systemic failures in damage prevention process

Comments