Pure Technologies Receives Pipeline Condition Assessment Contract
The Metropolitan Water District of Southern California (MWD) has awarded Pure Technologies’ wholly-owned subsidiary, Pure Technologies U.S. Inc., a contract worth up to US$4.2 million over five years for the inspection of their Prestressed Concrete Cylinder Pipelines (PCCP). Work under the contract is expected to begin immediately.
Under the terms of the contract, Pure Technologies will provide pipeline condition assessment services as part of MWD’s long-term PCCP Rehabilitation Program. The pipelines to be inspected will be selected based on their criticality to MWD’s water delivery system as well as the condition and repair data already collected by MWD.
This new contract is in response to MWD’s Aug. 2016 request for qualification (RFQ) for a Large Diameter Concrete & Metallic Pipeline Inspection Services project. The purpose of the RFQ was to develop a list of pre-qualified respondents who could provide inspection services for large-diameter water delivery pipelines utilizing state-of-the-art inspection technologies.
Related News
From Archive
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized
- Alaska LNG pipeline could require 7,000 workers at peak construction, developers say
- Ohio trench collapse kills one worker, injures two during pipe installation
- Elon Musk's Boring Co. fined for dumping drilling waste into Vegas sewer system
- $1.4 billion Midwest pipeline expansion to move more Canadian oil to U.S. Gulf
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized
- Massive water line failure leaves majority of Waterbury without service
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines

Comments