Bechtel Honored for Pipeline Integrity Management Tool
Bechtel has been awarded the prestigious 2018 Digital Edge 50 Award in recognition of its new Pipeline Integrity Management (PIM) tool. With support from Bechtel’s Future Fund, an internal incubator which finances development of disruptive technologies, innovators from the company’s pipeline business designed the tool to help customers prioritize critical pipeline integrity work and improve overall safety. The tool integrates pipeline data, Geographic Information Systems (GIS) and data-science modelling to help customers better forecast maintenance and replacement of pipeline systems.
“Bechtel has built more than 50,000 miles of pipeline – enough to circle the Earth twice,” said Richard Wall, Bechtel’s General Manager for Pipelines. “This extensive experience, combined with our data analytics capabilities, is allowing us to build new predictive models and deliver unparalleled digital solutions for new and existing customers” “Our PIM tool is one of our key competitive advantages in this sector and we are honored to receive this important award in recognition of the impact it will have across the pipeline industry.”
The PIM tool utilizes massive geospatial data sets and proprietary algorithms, creating detailed risk assessments based on over 100 parameters and relationships known to contribute to pipeline failures. This data is then used to analyze the impact of incremental changes in material, construction and geospatial characteristics along the length of the pipeline. Utilizing Bechtel’s Big Data & Analytics Center, the PIM tool can analyze hundreds of thousands of welds and joints of pipe in a matter of minutes, providing valuable assessments of a customer’s pipeline system in record time.
Each year, the Digital Edge 50 Award recognizes a select group of digital achievers whose organizations have made great strides toward being a digital-centric business. Entries are judged by a distinguished panel of IT and business leaders on criteria including innovation, complexity, scale and impact.
Related News
From Archive
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- PHMSA warns of heat risks in aging plastic gas distribution pipelines following deadly Pennsylvania explosion
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- OSHA seeks $1.2 million fine after fatal trench collapse in Connecticut
- Worm-like robot burrows underground to cut power line installation costs
- First tunnel boring machines complete testing for Hudson Tunnel Project
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- NWPX grows water infrastructure portfolio with Colorado precast facility

Comments