Sterling Construction to Replace Sewer, Water Infrastructure as Part of DFW Freeway Project
Sterling Construction Company, Inc. today announced that its subsidiary, Texas Sterling Construction Co. (TSC), has been awarded a contract by the City of Coppell to replace all existing water and wastewater infrastructure associated with the reconstruction of the Freeport Parkway.
Work is scheduled to begin during the spring of 2018, and expected to take 18 months to complete.
“The reconstruction of the Freeport Parkway demonstrates the versatility that our TSC business provides including concrete work, water infrastructure improvement, and bridge construction,” Joe Cutillo, Sterling’s Chief Executive Officer, said. “We are excited to be part of a project in a growing suburb of the Dallas-Fort Worth Metroplex that will ultimately improve drainage and sewer lines and traffic flow for motorists.”
Related News
From Archive
- OSHA investigates fatal trench collapse at Conroe construction site
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Texas811 launches real-time excavation detection to prevent utility strikes
- Oil pipeline struck during fiber optic construction spills into L.A. storm drains
- Fiber drilling strike triggers major sewer failure, lawsuits in Florida
- Fatal trench collapse in Mass. leads to $4.6 million OSHA penalty, dozens of violations
- Texas811 launches real-time excavation detection to prevent utility strikes
- Race Communications breaks ground on Bakersfield fiber network
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Inside Infrastructure: Utility locators warn of systemic failures in damage prevention process

Comments