Solaris Water Midstream Starts Pecos Star Operations
Solaris Water Midstream said it has commenced operations on the first phase of its 300-mile Pecos Star water system, which is designed to serve oil and gas producers in the Delaware Basin of West Texas and New Mexico.
Phase One of Solaris Water’s Pecos Star System comprises approximately 50 miles of 12- and 16-inch produced-water pipelines, multiple disposal-well connections, the ability to supply recycled water and freshwater wells and ponds. The system is supported by long-term acreage dedications and minimum volume commitments from Solaris Water customers.
The build-out of additional phases is under way, with continuous construction expected over the course of the coming year. Upon completion, the Pecos Star System will include an extensive integrated network of more than 300 miles of high-capacity gathering and distribution pipelines ranging from 12 to 16 inches in diameter, dozens of disposal wells, storage ponds, aboveground storage and recycling facilities.
Solaris said the system is designed to provide customers with flexibility to move water across the entire system, with multiple connections to oil and gas operators for produced water, water supply, disposal wells and recycling facilities.
“The Pecos Star System is the first large-scale, fully integrated water handling and supply system in the Delaware Basin,” said Solaris Water Midstream CEO Bill Zartler. “Our system offers operators shared infrastructure to multiple disposal wells and recycling facilities with built-in redundancies to save capital and lower costs while reliably addressing both peak water production and peak water demand.”
In addition to its Delaware Basin operations, the Solaris Midstream Holdings subsidiary already operates produced-water gathering, transportation, disposal and recycling systems across four counties in the Midland Basin, including 85 miles of pipelines, two recycling facilities and 11 disposal wells.
From Archive
- U.S. water reuse boom to fuel $47 billion in infrastructure spending through 2035
- Major water pipe break in Puerto Rico hits over 165,000 customers
- Potomac River Tunnel project enters construction phase beneath Washington, D.C.
- U.S. Army Corps approves Enbridge's $500 million Line 5 Tunnel project
- Mexico accelerates $6.7 billion water infrastructure plan amid U.S. water disputes
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines
- Trump's tariffs drive $33 million cost increase for Cincinnati sewer project
- CASE Launches New Equipment Configurator At CaseCE.com
- Utah city launches historic $70 million tunnel project using box jacking under active rail line

Comments