NV5 awarded $16 million contract for Combined Sewer Overflow Reduction project in New York City
(UI) – NV5 Global, Inc. has been awarded a $16 million contract by the New York City Department of Environmental Protection to provide construction management services for the Bronx River Combined Sewer Overflow Reduction project.
Under this contract, NV5 will perform resident engineering, not at risk construction management, and engineering support services for the installation of a parallel relief sewer constructed by microtunneling. The new sewer and associated regulator chamber will direct flow away from combined sewer overflow outlets along the Bronx River towards the Hunts Point Wastewater Resource Recovery Facility.
This will support the New York City Department of Environmental Protection’s mission “to enrich the environment and protect public health for all New Yorkers by providing high quality drinking water, managing wastewater and stormwater, and reducing air, noise, and hazardous materials pollution.”
Related News
From Archive
- TxDOT advances massive drainage tunnel beneath I-35 in Austin
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- U.S. water reuse boom to fuel $47 billion in infrastructure spending through 2035
- $2.3 billion approved to construct 236-mile Texas-to-Gulf gas pipeline
- Major water pipe break in Puerto Rico hits over 165,000 customers
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines
- Trump's tariffs drive $33 million cost increase for Cincinnati sewer project
- Utah city launches historic $70 million tunnel project using box jacking under active rail line
- Tulsa residents warned after sewer lines damaged by boring work
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized

Comments