NV5 awarded $16 million contract for Combined Sewer Overflow Reduction project in New York City
(UI) – NV5 Global, Inc. has been awarded a $16 million contract by the New York City Department of Environmental Protection to provide construction management services for the Bronx River Combined Sewer Overflow Reduction project.
Under this contract, NV5 will perform resident engineering, not at risk construction management, and engineering support services for the installation of a parallel relief sewer constructed by microtunneling. The new sewer and associated regulator chamber will direct flow away from combined sewer overflow outlets along the Bronx River towards the Hunts Point Wastewater Resource Recovery Facility.
This will support the New York City Department of Environmental Protection’s mission “to enrich the environment and protect public health for all New Yorkers by providing high quality drinking water, managing wastewater and stormwater, and reducing air, noise, and hazardous materials pollution.”
Related News
From Archive
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized
- Alaska LNG pipeline could require 7,000 workers at peak construction, developers say
- Ohio trench collapse kills one worker, injures two during pipe installation
- Elon Musk's Boring Co. fined for dumping drilling waste into Vegas sewer system
- $1.4 billion Midwest pipeline expansion to move more Canadian oil to U.S. Gulf
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized
- Massive water line failure leaves majority of Waterbury without service
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines

Comments