Shawcor acquires stormwater products provider to expand stormwater management solutions
(UI) – Shawcor Ltd. has acquired the assets of Triton Stormwater Solutions, a privately owned provider of highly engineered, lightweight, composite materials-based underground infiltration chamber products, used primarily within stormwater management solutions. The product line will be consolidated into Shawcor’s Xerxes® business unit, which is reported as part of the Composite Systems segment.
Triton Stormwater Solutions provides customers with world-class stormwater products, customer service and manufacturing processes. In 2022, Triton Stormwater Solutions generated approximately US$8 million in revenue.
“The acquisition of Triton Stormwater Solutions’ technology portfolio allows Shawcor to further expand our ability to offer a complete, composite materials based, stormwater management solution,” said Martin Perez, President of Shawcor’s Composite Systems segment. “This important addition is tightly aligned with our existing Xerxes tank business and its Hydrochain™ product line and will serve to both optimize production efficiencies and unlock additional opportunities to serve our stormwater customers in North America, Europe and Asia-Pacific.”
Joe Miskovich, who founded Triton Stormwater Solutions in 2004, added, “We have been working together with Shawcor for the past two years to deliver robust and efficient solutions to manage stormwater from increased rainfall events and reduce flood risks.”
Related News
From Archive
- OSHA investigates fatal trench collapse at Conroe construction site
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Texas811 launches real-time excavation detection to prevent utility strikes
- Oil pipeline struck during fiber optic construction spills into L.A. storm drains
- Fiber drilling strike triggers major sewer failure, lawsuits in Florida
- Fatal trench collapse in Mass. leads to $4.6 million OSHA penalty, dozens of violations
- Texas811 launches real-time excavation detection to prevent utility strikes
- Race Communications breaks ground on Bakersfield fiber network
- Final Lake Erie sewer tunnel project set to begin after decades-long $3 billion effort
- Inside Infrastructure: Utility locators warn of systemic failures in damage prevention process

Comments