South Dakota allocates $65 million for statewide water and waste projects
7/9/2024
(UI) — The South Dakota Department of Agriculture and Natural Resources (DANR) announced nearly $65 million in grants and loans for water and waste infrastructure projects across the state.
The funding includes $768,000 in grants and $64 million in low-interest loans, with $16.17 million in principal forgiveness. DANR Secretary Hunter Roberts highlighted the importance of this support for maintaining safe and reliable water, wastewater, and solid waste systems.
Key Projects Funded:
- Britton: $733,000 for wastewater improvements.
- Central City: $182,000 to address stormwater management.
- Chamberlain: $500,000 to upgrade the drinking water system.
- Deadwood: $2.9 million for water system reliability.
- Grant-Roberts Rural Water System: $2.5 million for capacity improvements, including $619,000 in principal forgiveness.
- Ipswich: $390,100 for storm sewer construction, with $100,000 in principal forgiveness.
- Joint Well Field: $4.1 million for a new water treatment plant.
- Madison: $2.6 million for water infrastructure, plus $2.7 million for sanitary infrastructure.
- Meadow Crest Sanitary District: $650,000 loan and $168,000 grant for a new well.
- Mid-Dakota Rural Water System: $14.7 million with full principal forgiveness for bulk water service to Wessington Springs.
- Miller: $1.1 million for water system improvements, including $720,000 in principal forgiveness.
- Northville: $125,000 for water storage tank upgrades.
- Powder House Pass Community Improvement District: $2.1 million for wastewater treatment facility upgrades.
- Sioux Falls: $11 million for sanitary sewer expansion.
- South East Council of Governments: $500,000 grant for solid waste management loans.
- Southern Missouri Recycling and Waste Management District: $100,000 grant and $400,000 loan for a new baler.
- Wessington Springs: $1.66 million for water system upgrades.
- West River/Lyman Jones Rural Water System: $14.5 million for capacity and reliability improvements.
- Weston Heights Sanitary District: $1.1 million for sanitary sewer main improvements.
The board approved the funding during a meeting in Pierre, supported by state and federal sources. These funds aim to enhance the state's infrastructure for water, wastewater, and waste management.
Related News
From Archive
Sign up to Receive Our Newsletter
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- PHMSA warns of heat risks in aging plastic gas distribution pipelines following deadly Pennsylvania explosion
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- OSHA seeks $1.2 million fine after fatal trench collapse in Connecticut
- Worm-like robot burrows underground to cut power line installation costs
- First tunnel boring machines complete testing for Hudson Tunnel Project
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- NWPX grows water infrastructure portfolio with Colorado precast facility

Comments