Peoria Pilot Project Keeping Water out of Sewer System
PEORIA, Ill. (AP) — A pilot project has kept over 600,000 gallons of rainwater out of Peoria’s sewer system.
The city’s two-block Adams Street project uses rain gardens, permeable pavers and other techniques to retain water. The (Peoria) Journal Star (http://bit.ly/2qzw83b ) reports it has diverted 638,000 gallons of water since Oct. 22.
A single rainstorm can send 32 million gallons of rainwater rushing into Peoria’s combined sewer system. That system feeds into the city treatment plant and then the Illinois River.
Rainwater overloads the system 25 to 30 times per year, sending sewage into the river.
The U.S. Environmental Protection Agency has pressed Peoria since the 1980s to solve the problem.
A civil engineer with the city says Peoria would need 250 similarly scaled projects to counter the 160 million gallons of yearly rainfall.
Related News
From Archive
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion

Comments