Durham Advises Residents to Close Toilet Lids Due to Sewer Cleaning
DURHAM (AP) — People living downtown in the American Tobacco district should close their toilet lids for the next two months to avoid “blowback” from sewer cleaning work.
A news release Monday about the routine cleaning and inspections work in the city’s sanitary sewers said the process of “jetting” uses a pressurized water spray to clean sewer lines. It can cause “blowback” when excess air pressure is released through inadequately vented plumbing fixtures, officials said, “resulting in splashed water and foul odors.”
Crews also will use closed-circuit television to inspect pipes, remove jetted debris from and inspect manholes, use nontoxic dye to verify active sewer services and nontoxic smoke to test sewer infrastructure.
White smoke may be seen coming from manholes, drains and other structures during the testing, they said. The city’s contractor Hydostructures is expected to distribute information to residents at least seven days before any smoke testing begins.
While pedestrian and driveway access to buildings will be maintained at all times, the work also could affect traffic flow.
Affected lanes are on West Peabody Street; Gregson Street between West Main and Chapel Hill streets; Memorial Street; Burch Avenue; Duke Street between Chapel Hill and Memorial streets; Chapel Hill Street between William Vickers Avenue and Ramseur Street; William Vickers Avenue; and Jackson Street.
Related News
From Archive
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- PHMSA warns of heat risks in aging plastic gas distribution pipelines following deadly Pennsylvania explosion
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- OSHA seeks $1.2 million fine after fatal trench collapse in Connecticut
- Worm-like robot burrows underground to cut power line installation costs
- First tunnel boring machines complete testing for Hudson Tunnel Project
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- NWPX grows water infrastructure portfolio with Colorado precast facility

Comments