Protesters Briefly Shut Down Line 3 Pipeline Construction
SUPERIOR, Wis. (AP) — Protesters opposing the replacement of Enbridge Energy’s aging Line 3 oil pipeline shut down construction in northern Wisconsin for a brief time.
Enbridge spokeswoman Jennifer Smith says a group of about 20 protesters entered a worksite outside Superior on Monday and vandalized equipment before leaving on their own. She didn’t immediately have a damage estimate.
Video footage posted on social media shows masked protesters locking themselves onto equipment.
Smith says there were no injuries and no arrests. Douglas County Sheriff Tom Dalbec didn’t immediately respond to a request for comment.
The Line 3 pipeline carries Canadian crude from Alberta to Wisconsin, clipping the northeastern corner of North Dakota and crossing northern Minnesota. Enbridge is working to replace the line but tribal and environmental groups are fighting the $7.5 billion project.
Related News
From Archive
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion

Comments