SYRACUSE, N.Y. (AP) — Officials in central New York say an aging sewer pipe that’s slated to be replaced has failed yet again, causing 4.5 million gallons (17 million liters) of raw sewage to flow into a lake.
Failed Sewer Pipe Spews 4.5M Gallons Into New York Lake
11/1/2017
The Syracuse Post-Standard reports Onondaga County officials say the pipe that runs along freight train tracks over a creek inlet into Onondaga Lake broke Monday morning after more than 3 inches of rain fell in two days.
County authorities said Tuesday afternoon that sewage spilled at a rate of 9,000 gallons (34,000 liters) per minute for more than eight hours.
The same pipe has failed several times over the past five years, including in October 2016, when heavy rains caused 13 million gallons (49 million liters) of raw sewage to spill into the lake.
The county is looking at spending $18 million to replace the 50-year-old pipe and related infrastructure.
Related News
From Archive
Sign up to Receive Our Newsletter
- TxDOT advances massive drainage tunnel beneath I-35 in Austin
- Glenfarne Alaska LNG targets late-2026 construction start for 807-mile pipeline project
- U.S. water reuse boom to fuel $47 billion in infrastructure spending through 2035
- $2.3 billion approved to construct 236-mile Texas-to-Gulf gas pipeline
- Major water pipe break in Puerto Rico hits over 165,000 customers
- Pennsylvania American Water launches interactive map to identify, replace lead water service lines
- Trump's tariffs drive $33 million cost increase for Cincinnati sewer project
- Utah city launches historic $70 million tunnel project using box jacking under active rail line
- Tulsa residents warned after sewer lines damaged by boring work
- Fatal trench collapse halts sewer construction in Massachusetts; two workers hospitalized

Comments