Lawsuit Alleges Michigan City Forced Labor on Residents
ANN ARBOR, Mich. (AP) — A federal lawsuit alleges that Ann Arbor imposed forced labor on 3,000 residents by requiring home owners to maintain mandatory sump pumps in the southeast Michigan city.
Attorney Irvin Mermelstein filed the lawsuit against Ann Arbor on behalf of four residents in late October, the Ann Arbor News reported . The suit argues that the city’s footing drain disconnection program amounted to the government taking private property through physical invasion and permanent physical occupation.
The program began in 2001 to deal with basement sewage backups. Homeowners had to disconnect footing drains around their homes and install sump pumps. The change diverted stormwater from the city’s sanitary sewer system and directed it to the stormwater drainage system.
Some residents have complained that maintaining sump pumps has been a burden and caused new flooding issues. Other residents have said the city’s storm water drainage system can’t handle heavy rains.
The lawsuit alleges the city’s sewer system wasn’t able to handle the city’s growth and development over the last several decades. It also argues that the city failed to construct properly functioning storm drains in the areas where the plaintiffs’ homes are located.
The city attorney’s office is reviewing the complaint. Earlier this year, the Michigan Court of Appeals sided with the city in two cases that challenged the program’s legality. City officials have said the program was legal and effectively reduced sewage backups.
The city no longer requires homeowners to participate in the program.
Related News
From Archive
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion

Comments