Pennsylvania DEP Sanctions Eurofins QC Lab for Water Testing Violations

The Pennsylvania Department of Environmental Protection (DEP) will collect a $600,000 penalty from Eurofins, QC (EQC), for violations related to falsified and mishandled discharge water tests and results at their lab in Southampton, Pennsylvania.
“DEP relies on accredited, third-party laboratories to conduct testing and ensure that regulated entities are complying with state laws and regulations,” said DEP Secretary Patrick McDonnell. “Falsifying records and mishandling samples undermines the trust that DEP places in labs like EQC, and we will not hesitate to penalize labs that do not meet our expectations.”
DEP first discovered possible violations in December 2016 while conducting an audit of EQC’s whole effluent toxicity testing (WETT) results, which are used to determine compliance with National Pollutant Discharge Elimination System (NPDES) regulations. Testing results reviewed in the audit found sample results that appeared to be photocopies of previous data sheets, with minor edits made. The lab’s accreditation expired in February 2017 and was not renewed.
After being alerted to the questionable results, EQC hired a third-party auditor to review records from the facility. That audit found hundreds of cases of manipulated or falsified data, as well as hundreds of missing records, and cases where samples were mishandled.
Related News
From Archive

- NTSB publishes preliminary report on fatal gas pipeline explosion in Lexington, Mo.
- 290-mile gas pipeline expansion proposed across Georgia, Alabama and South Carolina
- Ripple Fiber breaks ground on $140 million project, expanding into central Mass.
- City of Albuquerque halts fiber optic construction in response to damage, complaints
- Body retrieved day after fatal trench collapse at Bakersfield, Calif., job site
- Gehl and Mustang offer world’s largest skid loader
- Growing Pains and Gains
- Authorities investigating trench collapse that killed worker in Ashburn, Va.
- City of Albuquerque halts fiber optic construction in response to damage, complaints
- Pasadena, Calif., undergrounding project could take 500 years to finish
Comments