Louisville, KY Set to Build $200 Million Sewer Tunnel
(UC) – In order to protect itself from waterway overflow, the City of Louisville is preparing to build a 20-foot wide underground sewer tunnel, to the tune of $200 million.
The state of Kentucky receives a large amount of rainfall during the year which overflows the city’s outdated sewer system. Due to the age and design of the pipe system, flooding is often a problem during the rainy season.
In 2005, the City signed a Consent Decree with the federal government to reduce the overflows by 2024. The plan involves greatly increasing the amount of storage available for the runoff until it can be safely transported to treatment facilities.
The $1.15 billion project includes treatment center modifications, new drainage pipes, repurposing land use, storage basins, and an underground tunnel capable of capturing and storing 55 million gallons of sewage and rainwater.
The 20-foot wide tunnel will stretch four miles under the city, 18 stories underground. It will cost $200 million and is expected to be completed in 2020.
Related News
From Archive
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion

Comments