Doosan Introduces its First Line of Dozers
Doosan brings its expertise in the construction equipment industry to a new category in 2022 with the company's first-ever line of Doosan dozers.
Coming to North America next year, the new dozers will complement other Doosan equipment on construction jobsites for earthmoving projects. Doosan dozer customers will notice similarities in the cabs and instrumentation between the dozers and Doosan wheel loaders and excavators. This can provide a seamless transition from one machine to the next.
This new machine delivers powerful pushing performance, fuel efficiency and all-day operator comfort. It’s built for the most demanding conditions and features a dual/single flange-type roller with several track guard options.
Designed with operators in mind, the DD100 features the 8-inch Smart Touch display, giving operators complete control from a convenient, easy-to-read touch screen. It also offers superior visibility with minimized front pillars, maximum glass area and a standard rearview camera — plus LED lights and front, rear and side wiper blades.
The DD100 features a Doosan engine with convenient maintenance access points and does not require the use of a diesel particulate filter to meet current emission standards. Doosan DD100 owners can add the 3D Machine Guidance and 3D Machine Control features as an option for greater accuracy and ease of operation.
Specs
- Horsepower: 122 hp (91 kW)
- Operating weight: 25,309 lb. (11,480 kg)
- Blade capacity: 3 cu. yd. (2.3 m3)
- Blade height: 3 ft. 7 in. (1.1 m)
- Blade width: 8 ft. 10 in. (2.7 m)
- Blade angle: 22.5 degrees
- Drawbar pull: 33,721 lbf. (15,296 kgf)
- Track length: 7 ft. 7 in. (2.3 m)
- Travel speed, max: 5.7 mph (9.2 km/hr)
Preliminary specs, subject to change
Related News
From Archive

- 290-mile gas pipeline expansion proposed across Georgia, Alabama and South Carolina
- City of Albuquerque halts fiber optic construction in response to damage, complaints
- Body retrieved day after fatal trench collapse at Bakersfield, Calif., job site
- $227 million Garnet Valley water project advances, set to create 73,000 jobs in Nevada
- Pasadena, Calif., undergrounding project could take 500 years to finish
- Gehl and Mustang offer world’s largest skid loader
- Growing Pains and Gains
- Authorities investigating trench collapse that killed worker in Ashburn, Va.
- City of Albuquerque halts fiber optic construction in response to damage, complaints
- Pasadena, Calif., undergrounding project could take 500 years to finish
Comments