Doosan will offer new platform for excavators
Under a new partnership, Doosan Infracore North America, LLC will offer the Trimble Earthworks Grade Control Platform for excavators as an optional factory-installed machine control solution for the North American market.
Trimble Earthworks is designed to make grading more accurate, consistent, faster and easier in a range of applications, including residential and commercial sites, trenches, embankments, ditches and finished slope work.
“We’re excited to partner with Trimble because it will help expand our Doosan excavator technology offerings and boost our customers’ productivity,” said Jaeuk Kim, director of product management. “Doosan crawler excavator customers can enhance their trenching accuracy with the increased technology, contributing to an improved ROI.”
Doosan offers a 2D machine control factory-installed option that includes a 10-inch Android™ tablet display running the Trimble Earthworks software application. This option includes rugged Trimble hardware, designed and tested for the harsh conditions found on construction sites.
This integrated 2D grade control with automatics allows operators to create smooth, flat or sloped surfaces more easily. When the excavator is placed in Auto mode, the operator controls the stick, and Trimble Earthworks controls the boom and bucket to stay on grade, reducing overcut and increasing production.
Contractors can work with their Doosan dealer to upgrade their 2D system to 3D through a local SITECH® dealer. SITECH is Trimble’s global distribution network, and local Doosan dealer technology partner, providing installation services, personalized training and local technical support for Trimble construction technology.
Related News
From Archive
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- PHMSA warns of heat risks in aging plastic gas distribution pipelines following deadly Pennsylvania explosion
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- OSHA seeks $1.2 million fine after fatal trench collapse in Connecticut
- Worm-like robot burrows underground to cut power line installation costs
- First tunnel boring machines complete testing for Hudson Tunnel Project
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- NWPX grows water infrastructure portfolio with Colorado precast facility

Comments