VINCI Construction to restore road, improve drainage, wastewater in West Africa
(UC) — VINCI Construction, through its subsidiary Sogea-Satom, was selected by the Côte d’Ivoire Ministry of Equipment and Road Maintenance to restore a stretch of the “Coastal Road” between Dabou and Grand Lahou, connecting the country’s two main port cities (Abidjan and San Pedro).
The project involves restoring 93 km (58 miles) of road, widening the road over a 10-km (6-mile) section ahead of Dabou, and improving the drainage and wastewater network to reduce the risk of flooding. The wells drilled as part of the project will eventually be connected to the public water system that serves the town of Toupah in the Dabou department.
The project, which is worth €97 million ($102 million), will last 15 months, involving on average 450 people, 50% of whom will be employed as a priority from the local region.
Renovating this road will enhance safety and reduce congestion between these two major cities, as San Pedro prepares to host the Africa Cup of Nations in 2023.
Sogea-Satom has operated for many years in Côte d’Ivoire, working in particular on upgrading the fishing port in Abidjan, bolstering the drinking water distribution system in Abidjan, building the Songon and Saint Viateur drinking water treatment plants, building a road connecting Bouaké and Ferkessédougou, and building the Yamoussoukro stadium, where games will be played as part of the Africa Cup of Nations in 2023.
Related News
From Archive
- OSHA issues 16 citations following fatal sewer confined space incident
- 27 pipeline safety violations tied to deadly Pa. chocolate factory explosion
- Contractor gas line strike triggers home explosion in Missouri
- LA recovery reports call for $650 million power line burial, major utility upgrades in Pacific Palisades
- Comprehensive microtrenching FAQ: Key insights on the Vermeer MTR516 microtrencher
- T-Mobile to expand fiber broadband infrastructure footprint with $4.9 billion Metronet acquisition
- First tunnel boring machines complete testing for Hudson Tunnel Project
- NWPX grows water infrastructure portfolio with Colorado precast facility
- Cityside launches $100 million fiber build in Corona, Calif.
- FiberLight to build 1,400-mile West Texas dark fiber network in $350 million expansion

Comments