Fuel leak in Virginia shuts down part of Colonial Pipeline
DANVILLE, Va. (AP) — A diesel fuel leak in Virginia shut down part of the Colonial Pipeline, the nation's largest fuel pipeline, which supplies roughly half the fuel consumed on the East Coast, but it is expected to restart Saturday, the company said.
The spill was discovered Tuesday. And while this particular line is shut down, the rest of the system is operating normally, spokesperson David Conti said in an email.
Crews are fixing equipment that failed at the Witt booster station near Danville, Colonial said in a statement. The failure caused a spill that was detected during a routine station check and appears to be contained to the property, the Alpharetta, Georgia-based company said. The company didn't say what caused the leak or how much had spilled.
Colonial transports gasoline, diesel, jet fuel and home heating oil from refineries located on the Gulf Coast through pipelines running from Texas to New Jersey. Its pipeline system spans more than 5,500 miles (8,850 kilometers), transporting more than 100 million gallons (378 million liters) a day. The impacted line carries about 885,000 barrels of product a day from Greensboro, North Carolina, to Linden, New Jersey, the Danville Register & Bee reported.
In May 2021, the company temporarily shut down its operations after a ransomware attack.
Related News
From Archive

- Intrepid Fiber breaks ground on fiber optic network in Superior, Colo.
- Excavator collides with I-95 overpass in Henrico, Va., causing multi-vehicle crash
- Shrewsbury, Mass., expands sewer inspections and cleaning efforts
- Two workers rescued after hours trapped in Mich. trench collapse
- Trump calls for Keystone XL pipeline revival, but developer has moved on
- Illinois overhauls Peoples Gas pipeline program, mandates focus on high-risk pipes
- Ameren Illinois to invest $140 million in natural gas pipeline replacement program
- Charlottesville, Va., to begin work on 24-inch water line for Rivanna River crossing
- Mass. governor slams Trump for ‘dangerous delay’ of $50 million in lead pipe replacement funds
Comments