Heath Consultants releases PPB advanced mobile leak detection system
(UI) — Heath’s Discover advanced mobile leak detection (AMLD) system can aid in reducing methane emissions through the identification of gas leaks on aging distribution infrastructure with negligible false positives and negatives compared to competing technologies. It can be used for upstream, midstream and downstream in super emitter mode to reduce methane emissions by estimating emission quantification.
Detection Technology
Discover AMLD is an open path system utilizing Tunable Diode Laser Absorption Spectroscopy (TDLAS). Resolution is in the part per billion (ppb) range for both methane and ethane. Ethane detection aids in determining whether a detection is pipeline gas or naturally occurring biogas. Sensitivity levels, along with a proven detection algorithm, can detect and distinguish between a pipeline gas leak verses a non-pipeline gas leak, such as sewer, landfill and soil/biogas indications.
System Components
Discover AMLD consists of a vehicle equipped with the detector, GPS, anemometer and proprietary software loaded onto the vehicle’s computer/tablet. All components were designed to require minimal modifications to the vehicle and utilize the latest in wireless technology.
Analytics & Interface
The Discover AMLD analytic method improves the reduction of false positives and increases the accuracy of detection. Field testing has shown a greater than 95% probability of gas leak detection. Discover AMLD’s Graphical User Interface (GUI) streams your data directly to the secured cloud which can analyze and process the data in real-time to produce actionable reports.
Related News
From Archive
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- PHMSA warns of heat risks in aging plastic gas distribution pipelines following deadly Pennsylvania explosion
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- OSHA seeks $1.2 million fine after fatal trench collapse in Connecticut
- Worm-like robot burrows underground to cut power line installation costs
- First tunnel boring machines complete testing for Hudson Tunnel Project
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- NWPX grows water infrastructure portfolio with Colorado precast facility

Comments