Louisiana secures $4 million for water, sewer upgrades across 10 towns
10/22/2024
(UI) — U.S. Senator Bill Cassidy (R-LA) announced that Louisiana will receive over $4 million in federal funding to improve water and sewer systems across ten towns.
The funding comes from the Delta Regional Authority (DRA) as part of the Infrastructure Investment and Jobs Act (IIJA), which aims to boost infrastructure and quality of life in local communities.
“This is great news for Louisiana,” said Cassidy. “Thanks to the Infrastructure Law, we can expect to see even more dollars coming our way.”
The grants will address critical water and sewer issues in towns such as West Monroe, Maurice, and Kaplan, improving services for thousands of residents and supporting new developments.
Project Breakdown:
- City of West Monroe: $509,000 to upgrade 770 feet of sewer infrastructure, supporting economic growth.
- Town of Maurice: $509,000 to enhance the water system, addressing public health concerns and accommodating population growth.
- North Desoto Water System: $509,000 to construct a new booster station, improving water storage and supply for Stonewall and nearby areas.
- City of Minden: $509,000 to replace water mains, ensuring reliable service and improved fire protection.
- Town of Marion: $454,000 to rehabilitate a 64-year-old sewer lift station, addressing poor conditions and health violations.
- City of Kaplan: $418,100 for comprehensive sewer system rehabilitation to boost resilience and functionality.
- Village of Plaucheville: $218,000 to build a new water main, reducing service disruptions.
- Town of Lockport: $199,000 to improve sewer and wastewater systems, essential for sustaining the community and supporting tourism.
- Town of Waterproof: $80,000 to replace backup pumps in sewer lift stations, meeting increased usage demands.
Related News
From Archive
Sign up to Receive Our Newsletter
- Inside Sempra’s 72-mile pipeline with 18 major trenchless crossings
- Trump vetoes bill to finish $1.3 billion Colorado water pipeline
- PHMSA warns of heat risks in aging plastic gas distribution pipelines following deadly Pennsylvania explosion
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- OSHA seeks $1.2 million fine after fatal trench collapse in Connecticut
- Worm-like robot burrows underground to cut power line installation costs
- First tunnel boring machines complete testing for Hudson Tunnel Project
- Infrastructure failure releases 100,000 gallons of wastewater in Houston; repairs ongoing
- Construction jobs stumble into 2026 after weak year
- NWPX grows water infrastructure portfolio with Colorado precast facility

Comments